Announcements 2008

Date Headline Pages

PDF

05/12/2008 Maiden Drill start on the Mt Isa Phosphate Prospect 4 PDF
20/10/2008 Notice of Annual General Meeting / Proxy Form 11 PDF
13/10/2008 GBM confirms 6km Phosphate Anomaly near Mt Isa 3 PDF
29/9/2008 Release of escrow and Appendix 3B 9 PDF
25/9/2008 Confirmation of Iron Oxide Copper Gold Targets 4 PDF
25/8/2008 Phosphate potential identified at Mt Isa 3 PDF
6/8/2008 Appendix 3B - Quotation of Additional Securities 8 PDF
31/7/2008 Release of Escrow Securities 1 PDF
31/7/2008 Quarterly Exploration Report and Appendix 5B 21 PDF
24/7/2008  Managing Director presents on Boardroom Radio  1 PDF
22/7/2008 Mt Isa Acquisitions from Newcrest Mining  3 PDF
2/6/2008 Change of Registered Address 1 PDF
30/4/2008 Appendix 3B New Issue 8 PDF
30/4/2008 Appendix 3Y Change of Director's Interest 8 PDF
25/2/2008 Regarding Presentation to AUSIMM 1 PDF
8/2/2008 Non-Renounceable Issue 2 PDF
6/2/2008 Appendix 3B 8 PDF
6/2/2008 Entitlements Issue Prospectus 27 PDF
6/2/2008 Notice under section 708A 2 PDF
6/2/2008 Appendix 3B 8 PDF
31/1/2008 $1.75m Share Placement Completed 2 PDF
22/1/2008 GBM to Proceed with Loyalty Option Issue 2 PDF
Current Share Price
1.3c
Visit ASX Website
Current Gold Price
US$1199.90

Latest News

Significant resource Increase at Glen Eva Gold Deposit, Mt Coolon, Qld
• Gold resource increased by 77% to 0.9Mt averaging 2.2 g/t Au containing an estimated 66,000 ounces of gold.
• Potential exists to extend the Glen Eva Resource along strike and down dip.
• Significant grade zones, including:
o 24.8m @ 6.2 g/t Au from 100m and
o 24.6m @ 4.8g/t Au from 132m reported earlier this year from GBM drill hole GLD0002 (refer ASX release 22 March 2017)
1 June 2017
Notice of Change of Interests of Substantial Holder
Change in Substantial Holding.
28 April 2017
Koala Deposit Drilling Upgrade, Mt Coolon Gold Project
Stage 2 drilling program has now been completed and has identified gold mineralisation adjacent to the historic mine workings in the Koala Gold Deposit.
27 April 2017

Latest Reports

Report for the Quarter ended 31st March 2017
March Quarter Report 2017
31 March 2017
Report for the Quarter ended 31st December 2016
Highlights

Mount Coolon Gold Project:

Koala Gold deposit:
• Stage 1 of drilling programme has been completed at the Koala Gold Mine with 23 diamond holes drilled for a total of 1,303 metres
• Results have confirmed the presence of remnant high-grade gold mineralisation in quartz vein and breccia style settings throughout the old stope areas tested.
• The Company has commenced Stage 2 drilling in January 2017 and the program forms part of the Study to evaluate recommencement of mining operations at the Koala Gold Mine.
31 January 2017
Report for the Quarter ended 30th September 2016
Highlights
Mount Coolon Gold Project:
Eugenia Gold Deposit:
• Publication of Eugenia Heap Leach Scoping Study showing potential
economic viability.
• Recovered gold ounces total 32,588 at a C1 cost of $813 per ounce,
capital estimated at $8.3 million.
• Free cashflow generated will be allocated to accelerate expanding
the known open pit resources and the mineralising systems with the
aim to build the Mt Coolon Gold Project inventory to a level that will
support the commissioning of a CIL plant.
31 October 2016

Subscribe

Enter your email address to join our email newsletter

Contact Address

GBM Resources

ABN 91 124 752 745

Suite 8, 7 The Esplanade,
MT PLEASANT WA 6153

T: (08) 9316 9100

F: (08) 9315 5475

E: info@gbmr.com.au

 

Exploration Office

10 Parker St, Castlemaine VIC 3450

T: (03) 5470 5033